Castledown School

Castledown School Castledown School

Aiming To Win

Students at our school compete at the highest levels.

Aiming To Win Aiming To Win

Technology

Supporting learning with state of the art facilities.

Technology Technology

Flexibility

Learning at our school is taylored to the students individual needs.

Flexibility Flexibility

Important News

End of term arrangements - school closes at 12 noon on Wednesday 23rd July (Collingbourne students leave at 11.20 am)

Castledown is delighted to report that all vacancies have been filled on the teaching staff for September 2008.

 
Castledown School - Welcome
At Castledown School we put teaching and learning at the heart of everything we do. In the last three years the school has moved from being in Special Measures to one of the highest performing schools in the area. Castledown has recently been classified as "Good" in every aspect by Ofsted in September 2007.

As a small secondary school we know all of our students well and offer them an exciting curriculum with a high level of pastoral support. Our GCSE results have more than doubled in the past three years our Key stage 3 value added performance puts us in the top 7% of schools nationally.

Currently we are registering to become an Academy with a total rebuild of our current facilities and, over the next few years, an increase in numbers to 1,100 students including 250 in Post 16 education.

If you are interested in finding out more about us, please contact us and I would be only too pleased to show you around our school.

 
Academy News - Latest
The plans for the Academy are progressing well, with many aspects of opening a new school being considered in detail. There have been a large number of separate consultations with all stakeholders, and everyone, including the Governing Body, supports the project.

The opening of the Academy is planned for September 2009, with the move to the new buildings in September 2010. It is a very tight schedule but with everyone’s support, achievable.

The final decision to go ahead will be taken in March 2008, after which, providing the project is approved, there will be no turning back.

For updates, please log on to www.wellingtoncollege.org.uk or www.standards.dfes.gov.uk/academies
 

Term Dates

calendar.png 

Click on the image to download a PDF containing the school Term Dates.

 

School Newsletter

Copies of the latest newsletter are always available from the school but will soon be available to view on line.

 
Copyright 2008 Castledown School.